Shot Schedule Builder Create a shot schedule for a two-camera wedding film crew and alert the user to potential conflicts or gaps in coverage What you told us The owner coordinates a two-camera wedding film crew at Afterglow Films and builds the shot schedule for both camera operators. The owner creates a shot schedule and camera operators use it to determine their next location. The owner coordinates a two-camera wedding film crew The owner builds the shot schedule A missed first look cannot be reshot The owner needs to spot double bookings before the event Recommended first task Design the first screen around the shot schedule object Building the shot schedule is a crucial part of the workflow, and a tool to help create it efficiently could save time and reduce errors How it works • Identify the shot schedule object and its fields • Determine the action that changes its state • Design the interface with visual weight and using the owner's vocabulary • Include a second working view for handoff or saved record Technology choices • Front-end framework for building the user interface • Back-end framework for storing and managing the shot schedule data Design Use the approved brand colour #6F54A6 and typography that suits the trade Acceptance checks • Mia has first look 14:00–14:20 and family toast 14:10–14:30 → Overlap detected • Show an overlap for Mia → Overlap shown • Move the toast to Jules and clear the conflict → Conflict cleared • A new Mia shot starting exactly at 14:20 is back to back and must be allowed → Shot allowed • Test the shot schedule builder with a sample schedule and overlapping shots • Verify that the tool alerts the user to potential conflicts or gaps in coverage • Check that the user can easily add, remove, and rearrange shots in the schedule Assumptions to verify • The shot schedule is currently managed on paper and each camera operator's phone • The owner wants to visualize two time lanes to identify overlapping shots • The owner expects to hand off shots between camera operators to resolve conflicts Limits of the starter • One observable decision • Owner evidence and unknowns App built with Claude Fable 5.2 Your selected project Shot Schedule Builder What you wanted to prove On the shot schedule Mia has first look 14:00–14:20 and family toast 14:10–14:30. Show an overlap for Mia. Move the toast to Jules and clear the conflict. A new Mia shot starting exactly at 14:20 is back to back and must be allowed. Occupational research • Camera Operators, Television, Video, and Film • Operate television or motion picture cameras to record scenes for television broadcasts, advertising, or motion pictures. • Read and analyze work orders and specifications to determine locations of subject material, work procedures, sequences of operations, and machine setups. • https://www.onetonline.org/link/summary/27-4031.00 • O*NET 31.0 Database, U.S. Department of Labor, Employment and Training Administration. Selected task statements. CC BY 4.0. • https://creativecommons.org/licenses/by/4.0/